updates.
// October 18th, 2005 // 5 Comments » // general
just in case anyone is still out there. the drainage and venting plumbing has tested great. no leaks. i’m hoping to get copper and the sub-floor in this weekend.
about the floor. we’ve decided not to go stone tile on the floor (we’re still a go for the shower). between the 1/4″ underlayment, 1/4″ backer board and 1/2″ of thinset and tile i think there’d be too much of a difference in floor height between the bathroom and the walkway. on a positive note, however, we may be doing a cork floor. mmm… nothing’s totally decided yet… but we’ll see. anyways. what’s going on this weekend? beuller?
-mitch.

















